Audit Information
Supplier Name: _______________
Audit Date: _______________
Auditor: _______________
Products/Services Audited: _______________
Previous Audit Score: _____ / 100
Scoring: 2 = Fully compliant | 1 = Partially compliant | 0 = Non-compliant | N/A = Not applicable
Section 1: Quality Management System (20 points)
- Quality policy is documented, approved, and communicated to all staff (2)
- Quality objectives are defined, measurable, and tracked (2)
- Quality manual or equivalent documentation exists (2)
- Internal audit programme is in place and records are available (2)
- Management review meetings are conducted and documented (2)
- Corrective action system is in place with [root cause analysis](/blog/qa-root-cause-analysis-manufacturing-india) (2)
- Customer complaint handling procedure is documented (2)
- Document control procedure ensures current versions are in use (2)
- Quality records are maintained and retrievable (2)
- [ISO 9001](/blog/qa-iso-9001-implementation) or equivalent certification (or credible plan) (2)
Section Score: _____ / 20
Section 2: Process Controls (20 points)
- Manufacturing processes are documented with work instructions (2)
- Process parameters are defined and monitored (2)
- In-process inspection points are defined and followed (2)
- First Article Inspection (FAI) is conducted for new products (2)
- Change control process exists for process/material changes (2)
- Traceability from raw material to finished product is maintained (2)
- Non-conforming material is identified and segregated (2)
- Rework/repair process is controlled and documented (2)
- Production records are maintained (batch/lot records) (2)
- [Statistical process control](/tech-resources/qa-statistical-process-control-guide) is used where applicable (2)
Section Score: _____ / 20
Section 3: Measurement & Test Equipment (10 points)
- All measuring instruments are identified and calibrated (2)
- Calibration records are current and traceable to national standards (2)
- Out-of-calibration instruments are removed from use (2)
- Gauge R&R studies are conducted for critical measurements (2)
- Inspection equipment is adequate for the measurements required (2)
Section Score: _____ / 10
Section 4: Incoming Material Control (10 points)
- Approved supplier list is maintained (2)
- Incoming inspection procedure is documented and followed (2)
- Material certifications are collected and verified (2)
- Non-conforming incoming material is quarantined and dispositioned (2)
- Supplier performance is tracked and reviewed (2)
Section Score: _____ / 10
Section 5: Human Resources & Training (10 points)
- Job descriptions define quality-related competencies (2)
- Training records are maintained for all quality-critical roles (2)
- New employees receive quality training before working on product (2)
- Operators are qualified/certified for critical processes (2)
- Training effectiveness is evaluated (2)
Section Score: _____ / 10
Section 6: Facilities & Environment (10 points)
- Work environment is suitable for product quality (cleanliness, temperature, humidity) (2)
- Equipment is maintained with documented maintenance records (2)
- Storage conditions for materials and finished goods are appropriate (2)
- Handling and packaging procedures prevent damage (2)
- 5S or equivalent workplace organisation is in place (2)
Section Score: _____ / 10
Section 7: Corrective Action Capability (10 points)
- Root cause analysis methodology is understood and applied (2)
- Corrective actions are implemented within agreed timelines (2)
- Effectiveness of corrective actions is verified (2)
- Lessons learned are shared across the organisation (2)
- Repeat NCRs from previous audits have been addressed (2)
Section Score: _____ / 10
Audit Summary
| Section | Max Score | Actual Score | % |
|---|---|---|---|
| Quality Management System | 20 | ||
| Process Controls | 20 | ||
| Measurement & Test Equipment | 10 | ||
| Incoming Material Control | 10 | ||
| Human Resources & Training | 10 | ||
| Facilities & Environment | 10 | ||
| Corrective Action Capability | 10 | ||
| **Total** | **90** |
Audit Result:
- •81–90: Approved - no conditions
- •63–80: Conditionally Approved - corrective actions required within 60 days
- •< 63: Not Approved - re-audit required after corrective actions
Major Non-Conformances (must be resolved before approval):
Minor Non-Conformances (resolve within 60 days):
Auditor Signature: _______________ Date: _______________
Supplier Representative: _______________ Date: _______________