← Resources/ChecklistQuality Assurance

Supplier Quality Audit Checklist: 60-Point Assessment for Manufacturing SMBs

12 March 2026·8 min read

Audit Information

Supplier Name: _______________

Audit Date: _______________

Auditor: _______________

Products/Services Audited: _______________

Previous Audit Score: _____ / 100

Scoring: 2 = Fully compliant | 1 = Partially compliant | 0 = Non-compliant | N/A = Not applicable


Section 1: Quality Management System (20 points)

  • Quality policy is documented, approved, and communicated to all staff (2)
  • Quality objectives are defined, measurable, and tracked (2)
  • Quality manual or equivalent documentation exists (2)
  • Internal audit programme is in place and records are available (2)
  • Management review meetings are conducted and documented (2)
  • Corrective action system is in place with [root cause analysis](/blog/qa-root-cause-analysis-manufacturing-india) (2)
  • Customer complaint handling procedure is documented (2)
  • Document control procedure ensures current versions are in use (2)
  • Quality records are maintained and retrievable (2)
  • [ISO 9001](/blog/qa-iso-9001-implementation) or equivalent certification (or credible plan) (2)

Section Score: _____ / 20


Section 2: Process Controls (20 points)

  • Manufacturing processes are documented with work instructions (2)
  • Process parameters are defined and monitored (2)
  • In-process inspection points are defined and followed (2)
  • First Article Inspection (FAI) is conducted for new products (2)
  • Change control process exists for process/material changes (2)
  • Traceability from raw material to finished product is maintained (2)
  • Non-conforming material is identified and segregated (2)
  • Rework/repair process is controlled and documented (2)
  • Production records are maintained (batch/lot records) (2)
  • [Statistical process control](/tech-resources/qa-statistical-process-control-guide) is used where applicable (2)

Section Score: _____ / 20


Section 3: Measurement & Test Equipment (10 points)

  • All measuring instruments are identified and calibrated (2)
  • Calibration records are current and traceable to national standards (2)
  • Out-of-calibration instruments are removed from use (2)
  • Gauge R&R studies are conducted for critical measurements (2)
  • Inspection equipment is adequate for the measurements required (2)

Section Score: _____ / 10


Section 4: Incoming Material Control (10 points)

  • Approved supplier list is maintained (2)
  • Incoming inspection procedure is documented and followed (2)
  • Material certifications are collected and verified (2)
  • Non-conforming incoming material is quarantined and dispositioned (2)
  • Supplier performance is tracked and reviewed (2)

Section Score: _____ / 10


Section 5: Human Resources & Training (10 points)

  • Job descriptions define quality-related competencies (2)
  • Training records are maintained for all quality-critical roles (2)
  • New employees receive quality training before working on product (2)
  • Operators are qualified/certified for critical processes (2)
  • Training effectiveness is evaluated (2)

Section Score: _____ / 10


Section 6: Facilities & Environment (10 points)

  • Work environment is suitable for product quality (cleanliness, temperature, humidity) (2)
  • Equipment is maintained with documented maintenance records (2)
  • Storage conditions for materials and finished goods are appropriate (2)
  • Handling and packaging procedures prevent damage (2)
  • 5S or equivalent workplace organisation is in place (2)

Section Score: _____ / 10


Section 7: Corrective Action Capability (10 points)

  • Root cause analysis methodology is understood and applied (2)
  • Corrective actions are implemented within agreed timelines (2)
  • Effectiveness of corrective actions is verified (2)
  • Lessons learned are shared across the organisation (2)
  • Repeat NCRs from previous audits have been addressed (2)

Section Score: _____ / 10


Audit Summary

SectionMax ScoreActual Score%
Quality Management System20
Process Controls20
Measurement & Test Equipment10
Incoming Material Control10
Human Resources & Training10
Facilities & Environment10
Corrective Action Capability10
**Total****90**

Audit Result:

  • •81–90: Approved - no conditions
  • •63–80: Conditionally Approved - corrective actions required within 60 days
  • •< 63: Not Approved - re-audit required after corrective actions

Major Non-Conformances (must be resolved before approval):

Minor Non-Conformances (resolve within 60 days):

Auditor Signature: _______________ Date: _______________

Supplier Representative: _______________ Date: _______________

supplier auditquality auditISO 9001supplier managementchecklist